This is a message from the California Regional Water Quality Control Board, Central Valley (5).
A proposed agenda and briefing document for the 30 November 2015 stakeholder meeting for the Central Valley Pyrethroid Pesticides Total Maximum Daily Load and Basin Plan Amendment can be accessed with the links below: